Schedule a Call Back
Green Data Centre Foundation Laid at CEL, Ghaziabad
2025-06-28
Uttar Pradesh Chief Minister Yogi Adityanath and Union Minister Dr. Jitendra Singh recently laid the foundation stone of a state-of-the-art Green Data Centre at Central Electronics Limited (CEL), Ghaziabad. Developed under a Public-Private Partnership with ESDS, the ₹1,000 crore project will have a 30 MW capacity.
Dr. Singh praised CEL’s legacy in solar technology and its transformation through strategic collaboration, while the Chief Minister highlighted its contribution to rural electrification and infrastructure. The data centre will follow Tier III standards, with 200 high-density racks per floor, dual 10 Gbps links, and sustainable features such as rainwater harvesting, reflective roofing, and smart cooling.
The centre aims to attract startups, enterprises, and government agencies, and create skilled jobs. CEL’s revival model was commended as a benchmark for other PSUs. Dr. Singh also announced a Biotechnology Industrial Park in Lucknow and a Startup Conclave post-Independence Day.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
QNu Labs Validates ARMOS QKD in Global VIAVI Study
QNu Labs (www.qnulabs.com
), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...
Read More
Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru
Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...
Bondada Commissions 48.2 MWp Solar Projects
Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...
