Schedule a Call Back
Burdwan Road Flyover to Open by August Ahead of Durga Puja
2025-07-11
Siliguri, 8 July 2025 – The long-delayed Burdwan Road flyover in Siliguri is expected to be opened by August, just in time for the Durga Puja rush, according to the Siliguri Municipal Corporation (SMC).
Mayor Gautam Deb confirmed the update after a meeting with Public Works Department (PWD) officials at the SMC headquarters on Saturday.
Relief from Traffic Congestion
“The PWD has assured that the flyover will be operational by August, offering significant relief from traffic congestion, particularly during the festive period,” said Mayor Deb.
In parallel, the department has also agreed to commence widening of Nivedita Road, which connects Gurung Busty and Pradhan Nagar — a key corridor that runs parallel to Hill Cart Road.
Nivedita Road Expansion Underway
To facilitate road widening, SMC has already cleared over 100 roadside structures, including shanties and temporary shops.
The civic body plans to extend the road towards Gulma via Champasari, with major work likely to begin after Puja seaso
Delayed but Critical Project
The 1.1-kilometre-long flyover project was launched in 2018 but faced multiple delays, especially during the Covid-19 pandemic.
Original cost: Rs 44.85 crore (approx. £4.2 million)
Revised cost: Rs 68.75 crore (approx. £6.4 million)
Despite delays, the flyover remains one of the most vital infrastructure upgrades in Siliguri, intended to decongest urban traffic and improve travel across the city.
Officials Committed to Timely Delivery
An SMC official noted:
“These projects are crucial to addressing Siliguri’s chronic traffic problems. Both the flyover and Nivedita Road widening are being prioritised for quick completion.”

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
QNu Labs Validates ARMOS QKD in Global VIAVI Study
QNu Labs (www.qnulabs.com
), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...
Read More
Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru
Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...
Bondada Commissions 48.2 MWp Solar Projects
Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...
