L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.

The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.

Second track-work order on MAHSR project

This is L&T’s second major track-work package for the project. In April 2022, the company won Package T3, covering 116 km from south of Vadodara to Sabarmati depot. With both orders combined, L&T is now executing more than half of the track-works for the 508 km Mumbai-Ahmedabad corridor.

Japanese Shinkansen technology for India’s bullet train

The project will deploy Japanese Shinkansen J Slab Track Technology, engineered for speeds up to 320 kmph. The technology ensures superior ride quality, long-term durability, and simplified maintenance.

S V Desai, Whole-time Director & Sr EVP (Civil Infrastructure), L&T, said, “Our success in the T3 package involved rapid technology absorption, indigenisation of plant and machinery, and value engineering. This has been a key factor in our approach to this new order, and we are confident of delivering on time.”

L&T’s leadership in ballastless track systems

L&T has a proven track record in ballastless track technology, with ongoing projects in Indian metro systems including Bengaluru, Chennai, and Mumbai, as well as international assignments in Jakarta.

News source: Financial Express

Related Stories

MbPA, Japan’s UR Explore Vision 2047 Collaboration

Mumbai Port Authority, under the Ministry of Ports, Shipping and Waterways, held discussions with Japan’s Urban Renaissance...

Read More

Brigade Challenges Revocation of Chennai Project Clearance

Brigade Group has challenged the revocation of the Environmental Clearance (EC) granted to its Brigade Morgan Heights residential project in Peru...

Read More

Hafele Expands Loox Range with New LED Strip Lights

Häfele has expanded its Loox lighting portfolio with the launch of a new range of LED strip lights designed for residential interiors and furnit...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back