Beyond the Overlay

As the monsoon fades, India’s highways come alive again—yet many roads still fail too soon. 

What will it take to build pavements that last?
“In developed countries, highways are designed for 25 to 30 years; in India, it’s 15 to 20,” observes Muthu Annamalai, Vice-President – Projects, Vertis Infrastructure Trust. “We overlay roads in six to seven years, whereas abroad it happens after 12 to 15. Overloading, poor material choice and weak execution are the main culprits.”
Annamalai is clear: match binder grade with pavement temperature, ensure proper aggregate angularity and stripping value, and monitor quality on-site. “In one of our projects, strict quality control helped us resurface only 20 per cent of the area in 15 years,” he says. “Water is the first enemy of bituminous pavements. When we coated aggregates with waste plastic before bitumen, it created a barrier that stopped moisture damage. Five years on, that national highway stretch remains pothole-free.”

To read the full article Click Here


Related Stories

MbPA, Japan’s UR Explore Vision 2047 Collaboration

Mumbai Port Authority, under the Ministry of Ports, Shipping and Waterways, held discussions with Japan’s Urban Renaissance...

Read More

Brigade Challenges Revocation of Chennai Project Clearance

Brigade Group has challenged the revocation of the Environmental Clearance (EC) granted to its Brigade Morgan Heights residential project in Peru...

Read More

Hafele Expands Loox Range with New LED Strip Lights

Häfele has expanded its Loox lighting portfolio with the launch of a new range of LED strip lights designed for residential interiors and furnit...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back