Putzmeister Supports Vizianagaram Railway Tunnels

Putzmeister’s SPM 500 is supporting shotcreting work for the ECR Vizianagaram Railway Project in Andhra Pradesh, which involves the development of critical railway tunnels through challenging terrain.

The project requires consistent concrete application across complex tunnel geometries while addressing restricted machine movement, high rebound, material loss and productivity demands. Equipped with a Putzmeister PM1810 pumping unit, the SPM 500 delivers continuous concrete flow with minimal pulsation for uniform spraying.

Its 360-degree rotating nozzle enables precise application in intricate sections, while its extended reach reduces machine movement on site. PLC-controlled synchronisation between the dosing unit and concrete pump helps minimise rebound.

The machine is handling all four tunnels within the project, supporting faster execution, reduced wastage and dependable performance in demanding tunnel construction conditions.

Related Stories

Liebherr Excavators Win Red Dot Award

The new Liebherr A 909 Compact and A 911 Compact Litronic wheeled excavators have received the ‘Red Dot: Best of the Best’ award in the Produ...

Read More

SANY Installs 5 MW Wind Turbines in Gujarat

SANY India is supporting the installation of next-generation 5 MW wind turbines at Vinchhiya Village near Rajkot, Gujarat, marking another step i...

Read More

Hyundai CE Opens New Andaman Dealership

HD Hyundai Construction Equipment India inaugurated the new office facility of Sai Leelaa Motors LLP, its authorised dealership partner in the An...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back