Schedule a Call Back
Wirtgen Group Powers Mumbai–Pune Connectivity Project
2026-05-22
The inauguration of the Mumbai–Pune Missing Link marks a key milestone in Maharashtra’s infrastructure development, improving connectivity and reducing travel time between two major economic centres. Wirtgen Group India supplied advanced concrete and asphalt paving technologies that ensured precision, quality, and high operational efficiency.
Challenging mountainous terrain and tunnel sections near Lonavala and Khandala required reliable performance under demanding conditions. Wirtgen Slipform Pavers handled tunnel concrete paving, while Voegele Asphalt Pavers managed viaduct paving with consistent accuracy. A highlight was a 15?metre paving width achieved in a single pass, demonstrating the capability of Wirtgen equipment in large-scale projects.
By supporting complex paving operations efficiently, Wirtgen Group contributed to this landmark infrastructure achievement, reaffirming its commitment to modern road construction solutions in India.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
JCB Hydromax Sets Hydrogen Land Speed Record at 406.320 mph
British engineering major JCB has set a new world land speed record with its hydrogen-powered JCB Hydromax, achieving an average speed of 406.320...
BEML Wins GeM Award for Highest MSE Order Value
BEML Limited has received the “Maximum Order Value to MSEs” award at the 10th Foundation Day celebrations of the Government e-Marketplace (Ge...
BKT to Showcase Advanced Off-Highway Tyres at Bauma ConExpo
Balkrishna Industries Ltd (BKT) will showcase its latest off-highway tyre solutions at Bauma ConExpo India 2026, scheduled from September 15-18 a...
