Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.



The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological formations beneath the Sanjay Gandhi National Park and Yeoor Hills. Equipment from Herrenknecht Group brands H+E and TECHNI-METAL SYSTEMES will also be used. Herrenknecht India acknowledged the support and trust of Megha Engineering & Infrastructures (MEIL) and Amberg Engineering in the project.

Related Stories

JCB Hydromax Sets Hydrogen Land Speed Record at 406.320 mph

British engineering major JCB has set a new world land speed record with its hydrogen-powered JCB Hydromax, achieving an average speed of 406.320...

Read More

Schaeffler India Names Amit Bhalerao as Chief Operating Officer

Schaeffler India has appointed Amit Bhalerao as Chief Operating Officer (COO), effective August 10, 2026. He will lead the company's manufacturin...

Read More

BKT to Showcase Advanced Off-Highway Tyres at Bauma ConExpo

Balkrishna Industries Ltd (BKT) will showcase its latest off-highway tyre solutions at Bauma ConExpo India 2026, scheduled from September 15-18 a...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back