India?s longest electrified rail tunnel inaugurated in Andhra Pradesh

India?s Vice President M Venkaiah Naidu recently inaugurated what is known as the country?s longest electrified rail tunnel, in Andhra Pradesh. Constructed at Rs 4.37 billion in a record 43 months, the tunnel will provide seamless rail connectivity between Krishnapatnam Port and the hinterland areas for freight movement.

This 6.6-km-long tunnel is part of the 112-km-long Obulavaripalli-Venkatachalam railway line, and is situated between the state?s Cherlopalli and Rapuru stations. As reported, the tunnel is 6.5-m-high (rail level to roof), with a minimum contact wire height maintained at 5.2 m. LED lights at an interval of every 10 m have been provided inside the tunnel. Further, two sub-stations for electric power supply have been provided near Cherlopalli and Adurupalli; an Over Head Equipment (OHE) maintenance depot has been provided at Rapuru along with tower-car shed.

The tunnel is reportedly built in the shape of a horse shoe with the New Austrian Tunneling Method (NATM). And, the track has been constructed by providing Bi-block sleepers and Vaslo fittings, thus eliminating the use of ballast.

Related Stories

Dubai Property Sales Rise as Rental Activity Hits Record High

Dubai's real estate market recorded its highest-ever monthly rental activity in June, while property sales rose sharply in both value and volume,...

Read More

EUROBOND Expands NABL Accreditation to 51 Testing Parameters

EUROBOND, the flagship brand of Euro Panel Products, has expanded the National Accreditation Board for Testing and Calibration Laboratories (NABL...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back