Schedule a Call Back
IRCON bags NCRTC order worth Rs 7.23 bn

The first order that was issued includes the design, supply, installation and testing of receiving substations as well as associated works. It is primarily for viaducts and tunnels that will pass through Sarai Kale Khan to Duhai (EPE). This also includes Jangpura Stabling Yard and the Duhai Depot.
Additionally, it includes the SCDA system for a complete corridor of Delhi-Ghaziabad to Meerut RRTS corridor of NCRTC. The contract was accepted for approximately Rs 3.18 billion. Moreover, the tenure for the execution of the work has been decided as 50 months.
The next order includes the work on viaduct and tunnel that starts from Duhai (EPE to Modipuram). Its work includes the designing, supply, installation and testing of the above-mentioned routes. This includes Modipuram Depot for Delhi-Ghaziabad-Meerut RRTS corridor of NCRTC. The accepted contract is of an approximate Rs 4.05 billion. The tenure for the execution of the work has been decided as 54 months.
Ircon International is a state-owned PSU that is primarily into the engineering and construction sector.
Also read in CW on the Delhi-Ghaziabad-Meerut RRTS: NDB and Government sign Rs 370 bn loan pact


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
CAQM Holds High-Level Reviews With Haryana and Punjab on Air Quality
In a concerted effort to accelerate coordinated action against air pollution, the Commission for Air Quality Management in NCR and Adjoining Area...
India’s Quality Control Orders Expand Rapidly, Says Minister Goyal
Union Minister of Commerce and Industry Shri Piyush Goyal highlighted the substantial growth in India’s Quality Control Orders (QCOs), which ha...
Godrej Industries Plans Rs 7.5 bn Expansion to Boost Chemical Capacity
In a strategic move to achieve its ambition of becoming a $1 billion global player by 2030, Godrej Industries’ chemical business has announced ...