Schedule a Call Back
RVNL wins bid for Nagpur Metro Phase 2 civil package C6 project
2024-10-18
Reach 4A includes three stations: Pardi, Kapsi Khurd, and Transport Nagar, while Reach 3A features seven stations: Hingna Mount View, Rajiv Nagar, Wanadongri, APMC, Raipur, Hingna Bus Station, and Hingna. Maha-Metro had called for bids in January 2024 with an estimated cost of Rs. 307.34 crore and a 900-day completion timeline. The technical bids were revealed in March 2024, showcasing only two bidders: RVNL and YFC Projects – BBG Infrastructure JV. The YFC – BBG JV was disqualified due to non-compliance with the tender requirements, securing RVNL's position as the preferred contractor even before the financial bid was considered.
Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us