Schedule a Call Back
Western Railway Clears 780 Sq M Encroachment Near Bandra Pipeline
2025-06-02
Western Railway, in collaboration with several law enforcement agencies, conducted a significant operation today to reclaim public land on the south-east side of Bandra near the Tansa Pipeline. The large-scale encroachment removal drive involved over 225 personnel and resulted in the clearance of approximately 780 square meters of railway land that had been occupied by unauthorized structures. During the operation, 45 makeshift dwellings constructed from bamboo, tarpaulin, and plastic sheets were dismantled.
Western Railway stated that the demolition drive was carried out under tight security, with coordinated efforts from the Railway Protection Force (RPF), Government Railway Police (GRP), local police, and engineering staff from the railway department. Officials confirmed that despite the scale of the operation, it was executed smoothly and without any incidents.
A senior Western Railway official explained that the drive was part of a wider initiative to protect critical railway infrastructure from illegal encroachments. He highlighted that safeguarding these corridors was essential not only for railway operations but also for ensuring public safety.
Authorities further emphasized that regular inspections and strict enforcement measures would continue to maintain encroachment-free zones along important transport routes.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
QNu Labs Validates ARMOS QKD in Global VIAVI Study
QNu Labs (www.qnulabs.com
), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...
Read More
Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru
Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...
Bondada Commissions 48.2 MWp Solar Projects
Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...
