Telangana Sends Rs 196 B Metro Phase II-B Plan To Centre

430x85 The Telangana government has forwarded Hyderabad Metro Phase II-B to the Union Ministry of Housing and Urban Affairs, enclosing all detailed project reports. The scheme spans 86.1 km across three corridors and carries an estimated outlay of Rs 195.79 billion.

Three new corridors

Funding structure

The joint-venture model mirrors Phase II-A:

  • Telangana Rs 58.74 billion (30 per cent)
  • Union Government Rs 35.24 billion (18 per cent)
  • International debt Rs 93.98 billion (48 per cent)
  • PPP Rs 7.83 billion (4 per cent)

Earlier, Hyderabad sought clearance for Phase II-A (76.4 km, Rs 242.69 billion). Chief Minister A Revanth Reddy has urged swift Union approval, citing the need to relieve road congestion and support sustainable growth in the fast-expanding city.

Phase I delivered 69.2 km of track at Rs 220 billion, the world’s largest metro built under a PPP model.


Related Stories

QNu Labs Validates ARMOS QKD in Global VIAVI Study

QNu Labs (www.qnulabs.com

), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...

Read More

Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru

Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...

Read More

Bondada Commissions 48.2 MWp Solar Projects

Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back