Schedule a Call Back
Telangana Sends Rs 196 B Metro Phase II-B Plan To Centre
430x85 The Telangana government has forwarded Hyderabad Metro Phase II-B to the Union Ministry of Housing and Urban Affairs, enclosing all detailed project reports. The scheme spans 86.1 km across three corridors and carries an estimated outlay of Rs 195.79 billion.
Three new corridors
Funding structure
The joint-venture model mirrors Phase II-A:
- Telangana Rs 58.74 billion (30 per cent)
- Union Government Rs 35.24 billion (18 per cent)
- International debt Rs 93.98 billion (48 per cent)
- PPP Rs 7.83 billion (4 per cent)
Earlier, Hyderabad sought clearance for Phase II-A (76.4 km, Rs 242.69 billion). Chief Minister A Revanth Reddy has urged swift Union approval, citing the need to relieve road congestion and support sustainable growth in the fast-expanding city.
Phase I delivered 69.2 km of track at Rs 220 billion, the world’s largest metro built under a PPP model.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Concord Control Systems bags ₹56.58 crore Indian Railways order for locomotive safety systems
Concord Control Systems has secured a ₹56.58 crore order from Indian Railways for the supply, installation and commissioning of locomotive wire...
Hafele expands Bengaluru footprint with new Appliances Studio in Bommasandra
Häfele India has expanded its retail footprint in Bengaluru with the launch of Appliances Studio Amro Interio, its third exclusive appliances stud...
Our device can do 60-70 per cent of inspections remotely
Jarsh Safety, the Hyderabad-based industrial deep-tech startup, is redefining frontline worker protection with advanced safety wearables. In conver...
