Telangana Sends Rs 196 B Metro Phase II-B Plan To Centre

430x85 The Telangana government has forwarded Hyderabad Metro Phase II-B to the Union Ministry of Housing and Urban Affairs, enclosing all detailed project reports. The scheme spans 86.1 km across three corridors and carries an estimated outlay of Rs 195.79 billion.

Three new corridors

Funding structure

The joint-venture model mirrors Phase II-A:

  • Telangana Rs 58.74 billion (30 per cent)
  • Union Government Rs 35.24 billion (18 per cent)
  • International debt Rs 93.98 billion (48 per cent)
  • PPP Rs 7.83 billion (4 per cent)

Earlier, Hyderabad sought clearance for Phase II-A (76.4 km, Rs 242.69 billion). Chief Minister A Revanth Reddy has urged swift Union approval, citing the need to relieve road congestion and support sustainable growth in the fast-expanding city.

Phase I delivered 69.2 km of track at Rs 220 billion, the world’s largest metro built under a PPP model.


Related Stories

Concord Control Systems bags ₹56.58 crore Indian Railways order for locomotive safety systems

Concord Control Systems has secured a ₹56.58 crore order from Indian Railways for the supply, installation and commissioning of locomotive wire...

Read More

Hafele expands Bengaluru footprint with new Appliances Studio in Bommasandra

Häfele India has expanded its retail footprint in Bengaluru with the launch of Appliances Studio Amro Interio, its third exclusive appliances stud...

Read More

Our device can do 60-70 per cent of inspections remotely

Jarsh Safety, the Hyderabad-based industrial deep-tech startup, is redefining frontline worker protection with advanced safety wearables. In conver...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back