India Plans Three More Oil Reserves To Reach 90 Day Buffer

India, which imports more than 80 per cent of its crude, is mapping out three additional strategic petroleum reserves to lift its emergency stockpile to the 90 day level required for eventual membership of the International Energy Agency.

L. R. Jain, chief executive of Indian Strategic Petroleum Reserve Ltd, said Engineers India Ltd is carrying out feasibility studies for new depots at Bikaner in Rajasthan, Mangalore in Karnataka and Bina in Madhya Pradesh. Cabinet approval will be sought once the reports are complete.

The Bikaner project would use salt caverns to hold about 5.2–5.3 million tonnes of crude, while a new site at Mangalore is envisaged at 1.75 million tonnes. Capacity at Bina is still being finalised.

These proposals come on top of two federally cleared schemes: a 2.5 million tonne extension at Padur in Karnataka and a 4 million tonne facility at Chandikhol in Odisha. India already operates three reserves at Mangalore, Padur and Visakhapatnam with combined storage of 5.33 million tonnes, sufficient for roughly ten days of national demand.

“Building extra capacity means that, in any supply shock, we shall be better prepared,” Jain said, adding that rising domestic fuel consumption also warrants extra storage. Current commercial stocks and in transit supplies give the country cover for about 75 days.

India has reshaped its reserve policy to mirror models in Japan and South Korea, allowing private firms to lease space and trade stored crude, a move expected to attract oil majors and reduce the fiscal burden on the state. 

Related Stories

QNu Labs Validates ARMOS QKD in Global VIAVI Study

QNu Labs (www.qnulabs.com

), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...

Read More

Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru

Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...

Read More

Bondada Commissions 48.2 MWp Solar Projects

Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back