Schedule a Call Back
Railway Board rejects DPR for Delhi-Varanasi bullet train project
The proposed high-speed railway corridor between Delhi and Varanasi has hit a roadblock with the Railway Board rejecting the feasibility report on the project citing multiple curves along the route which will not be suitable for a bullet train to run at 350 kmph, sources said. The decision was taken at a meeting held by Railway Board Secretary R N Singh recently to review the bullet train project.The feasibility study report was presented by the National High Speed Rail Corporation (NHSRCL). The feasibility report proposed the corridor be built along the National Highway-2. It said this will help in the acquisition of land at cheaper rates and reducing the cost of construction.
However, the technical issue which led to the outright rejection of the proposal was that NH-2 had curved sections at many places between Delhi and Varanasi, which would make it highly dangerous for a train to run at 350 kilometre per hour.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
myHQ Report: Flexible Workspaces Dominate Demand
myHQ reports that 73 per cent of office space searches in India now favour flexible workspaces, with traditional leasing accounting for less than...
BITS Pilani Opens Smart Manufacturing Centre
BITS Pilani, through its Work Integrated Learning Programmes, inaugurated its Smart Manufacturing Competency Centre in Bengaluru, the second in a...
TK Elevator Begins India Factory Expansion Project
TK Elevator has commenced expansion of its manufacturing facility in India, marking a step towards strengthening local production and logistics c...
