Nepal to tackle issues in Arun III hydropower project

In a high-level meeting, Nepal Prime Minister Pushpa Kamal Dahal 'Prachanda' chaired the discussion and recommended that issues concerning the entry route of the Arun III Hydropower Project, the country's largest with a capacity of 900 MW, currently being constructed by an Indian company, should be resolved to ensure its timely completion. The project, located on the Arun River, is a run-of-the-river hydropower venture undertaken by SJVN Arun-III Power Development Company (SAPDC), a wholly-owned subsidiary of India's Satluj Jal Vidyut Nigam (SJVN).

SJVN operates as a joint venture between the Government of India and the Government of Himachal Pradesh. The hydroelectric power plant, situated in the Sankhuwasabha district, is set to become Nepal's largest hydroelectric facility in the Himalayan region.

It was further stated that Nepal will receive 21.9% of the electricity generated at the power plant as free power during the initial 25 years of commercial operations. Following this period, the plant will be handed over to the Nepal government.

Related Stories

Dubai’s welcoming city ranking supports property demand

Dubai’s ranking among the world’s most welcoming cities is expected to support long-term demand across the emirate’s residential property m...

Read More

Dreamfly plans 200 MWh drone battery facility

Dreamfly Innovations has announced plans to establish a 40,000 sq ft aviation battery manufacturing facility in North Bengaluru with an initial a...

Read More

Staunch Electronics Expands EMS Capabilities Amid India’s Manufacturing Growth

Staunch Electronics India, an Electronics Manufacturing Services (EMS), Original Equipment Manufacturer (OEM), and Original Design Manufacturer (OD...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back